Chi tiết - Haugiang_en

Menu được chọn không tồn tại.

List of project prioritized for ODA capital investment

Ngày 00:00:00 08-06-2020 - Lượt xem: 1946

o

Project name

Total

capital

In which

Scope

Location

For

construction

ODA

capital

Reciprocal capital

I

URBAN UPGRADING

345

328

17

Total of 3 projects

Districts and towns

1

Urban infrastructure upgrading inVi Thanh city.

150

140

10

 Transportation, water supply, drainage, power system upgrading in Vi Thanh city.

Vi Thanh city

2

Urban infrastructure upgrading in Nga Bay town

125

120

5

Transportation, water supply, drainage, power system upgrading in Nga Bay town.

Nga Bay town

3

Urban infrastructure upgrading in Long My district

70

68

2

Transportation, water supply, drainage, power system upgrading in Long my district

Long My district

II

WATER SUPPLY, 

WASTE WATER SEWAGE TREATMENT

356

304.5

51.5

7 projects in total

Districts and towns

4

Drainage system  and  waste water treatment construction in Song Hau Industrial Urban Area.

160

130

30

50.000-100.000 m3 /day and night

Chau Thanh district

5

Water supply construction in Song Hau Industrial Urban Area.

70

60

10

50.000-100.000 m3 /day and night

Chau Thanh district

6

Water-supply upgrading in Vi Thanh city.

15

14

1

40.000 m3 /day and night

Vi Thanh city

7

Drainage system  and  waste water treatment construction inNga Bay town.

70

60

10

10.000 m3 /day and night

Nga Bay town

8

Water-supply upgrading in Nga Bay town.

12

10

2

30.000 m3 /day and night

Nga Bay town

9

Water-supply upgrading in Long My town.

3

2.5

0.5

10.000 m3 /day and night

Long My district

10

Water treatment plant  and  fresh water reservoir of Hau Giang.

26

23

3

30.000 m3 /day and night

Vi Thuy district

III

HEALTHCARE

41.5

36.9

4.6

4 projects in total

 

11

Medical equipment in Hau Giang

20

18

2

500 beds for patients

Vi Thanh city

12

Vocational Medical school  in Hau Giang Province

16

14.4

1.6

 

Vi Thanh city

13

Medical waste treatment plant in Vi Thanh city.

3

2.5

0.5

Capacity of 4 tonnes/day

Vi Thanh city

14

Medical waste treatment plant inNga Bay town.

2.5

2

0.5

Capacity of 4 tonnes/day

Nga Bay town

IV

TRANSPORTATION 

38

33.5

4.5

7 projects in total

Districts

15

Luong Tam - Vinh Thuan Đong road construction

5

4,5

0,5

10km

Long My district

16

Hau Giang 3 road construction - Hiep Hung commune

6

5

1

11km

Phung Hiep district

17

Kinh Ba Thuoc road construction

5

4,5

0,5

12km

Vi Thuy district

18

Intervillage roads construction in Chau Thanh district

8

7

1

15km

Chau Thanh district

19

Hau Giang road construction - Ut Chuot canal.

5

4,5

0,5

10km

Chau Thanh A district

20

Lo Tong road construction

4

3,5

0,5

14km

Long My district

21

Lung Nia belt road construction

5

4,5

0,5

14km

Vi Thanh city

V

AGRICULTURE AND RURAL DEVELOPMENT

13.3

11

2.3

4 projects in total

Districts

22

Irrigation system upgrading for agricultural production in Vi Thuy district

2,5

2

0,5

Dredging 116km

Vi Thuy district

23

Irrigation canal system upgrading for high rice quality area in Tan Binh and Binh  Thanh  commune

2,4

2

0,4

Dredging 112km

Phung Hiep district

24

Irrigation canal system upgrading for high rice quality area in Tan Binh and Binh  Thanh  commune in Luong Tam, Luong Nghia, Xa Phien, Vinh Vien and Vinh Vien A commune

2,4

2

0,4

Dredging 113km

Long My district

25

Modernizing  breeding centers and aquatic pjoect  in Hau Giang.

6

5

1

Area:  6 ha

Vi Thuy district

VI

ELECTRICITY 

5.5

4.5

1.0

 2 project in total

Districts and towns

26

power supply project in Chau Thanh, Chau Thanh A and Phung Hiep communes

2,5

2

0,5

Supplying power for 4.640 households

Chau Thanh district, Chau Thanh A district, Phung Hiep district.

27

Electrification project in Tan Thanh and Đai Thanh commune (in Nga Bay town) - Hiep Hung and Tan Phuoc Hung communes (in Phung Hiep district)

3

2,5

0,5

Suplying power for 6.172 households

Nga Bay town, Phung Hiep district

VII

VOCATIONAL TRAINING

2,5

2

0,5

1 project in total

Long My District

28

Training center and communitydeveloping in Long My district.

2,5

2

0,5

Training scope: 500-700 students/year

Long My District

VIII

EDUCATION AND TRAINING

13

11.7

1.3

2 projects in total

 

29

Hau Giang economic-technical secondary school. 

9.2

8.3

0.9

2.500 to 3.000 students

Vi Thanh city

30

Vi Thanh high school

3.8

3.4

0.4

1.700 students

Vi Thanh city

IX

OTHER  TECHNICAL SUPPORT PROJECTS

22

20

2

5 projects in total

Districts,  towns, and cities

 

TOTAL

836.8

752.1

84.7

 Totally 3 projects investing in socio-economic infrastructure and 5 projects giving technical support.

Districts,  towns, and cities


Bạn chưa có đủ quyền truy nhập portlet này.
Đang online: 1
Hôm nay: 11
Đã truy cập: 39911